The handover deed (LOE art. 6)
The handover deed (acta de recepción) is the document by which the developer receives the works from the builder. For the buyer the relevant date is the delivery of the unit, usually coinciding with the public deed. From there the periods run.
The delivery deed should contain: identification, description of state, list of reserves (snagging list), date and signatures.
Snagging list: what to include
- Any visible defect: paint, tiling, handles, blinds, joinery.
- Measurements not matching plans.
- Differences from the specification document.
- Missing contractual items (kitchen cabinets, agreed appliances).
- Tests of installations (water, electricity, HVAC).
Retention of amounts
If there are pending defects to be rectified, the buyer can retain amounts until correction. Reasonable retention is 5-10% for minor defects, more for substantial ones.
Subsequent (hidden) defects
Defects not apparent at delivery that manifest later are covered by the LOE warranty (1, 3 or 10 years) regardless of the deed. Reserves at delivery only affect visible defects.
Typical procedure
- Pre-visit with technician (architect, surveyor) to inspect.
- Detailed list of defects with photographs.
- Delivery deed with express reserves.
- Proportional price retention.
- Reasonable cure period (15-30 days).
- If not met: pre-litigation letter + judicial claim.
Frequently asked questions
Can I refuse to sign the handover?
Yes, if there are essential defects making the unit uninhabitable. But it is preferable to sign with reserves rather than refuse, to avoid being in default.
Is hiring a technician mandatory?
Not legally, but strongly advised. An architect/surveyor spots what the buyer doesn't.
What if the developer refuses to accept the list?
Record it in the deed regardless and sign 'with reserves'. If they refuse to receive, send a pre-litigation letter with the list as evidence.